Pāvila draugi
EN
Support

St Paul's Church

Its history, its people, and what is happening to the building now.

The nave of St Paul's Church by day

History

St Paul's Church stands in Grīziņkalns, on Augusta Deglava Street. Professor Gustav Hilbig designed it, his son Hermann finished the work after his death, and it was consecrated on 8 November 1887. It was built in English Gothic forms and faced with yellow brick. Overhead are timber roof trusses, and in the pointed arch above the altar hangs Jānis Tilbergs' 1937 painting, The Resurrection of Christ. By day, without concert lighting, you can see how carefully everything here was made.

The church's south front and tower, built from laser-scan points
The south front as a laser-scan point cloud, 2026
  1. 1878

    Riga city council grants land and funds to build the church.

  2. 1885

    The foundation stone is laid on 19 May.

  3. 1887

    Consecrated on 8 November. Designed by Gustav Hilbig (1822-1887) and completed by his son Hermann Hilbig (1860-1939).

  4. 1912

    Side portals are added and the E. F. Walcker & Co organ is installed.

  5. 1937

    Jānis Roberts Tilbergs paints the altarpiece, The Resurrection of Christ.

  6. 2024

    A technical inspection records cracks in the church walls.

  7. 2026

    An architectural study begins: the church is measured with a laser scanner.

Status
cultural monument of national significance, No. 7775
Height
58 m to the top of the spire cross
The church tower and nave in daylight, trees in the foreground
The church from Jāņa Asara Street

Sound, film and people

In 1912 the church received an organ by the German firm E. F. Walcker & Co, and it still plays. At okoncert organ concerts the musicians sometimes play from the gallery, next to the organ: in such a spacious acoustic they need to see and hear each other. For many of us, the most beautiful concerts in Riga happen here.

The interior is known from film: Pastor Schlag's church in Seventeen Moments of Spring was shot here. But people do not come for a film set. They come for Sunday worship, for a candlelit concert, for a tour of the tower with its organ and clock mechanisms.

The church is home to a Lutheran congregation led by Pastor Ģirts Prāmnieks. Sunday worship is at 10:00, volunteer teachers run the Sunday school, and everyone is welcome at the Alpha course on Thursdays, no sign-up needed. The congregation opens its doors to concerts, tours and anyone stepping inside for the first time.

What is happening to the walls

The west front and tower, with gold frames above the windows on either side
The west front. Gold frames mark the crack zones on either side of the tower

In the west wall of the nave, on both sides of the tower above the windows, there are cracks on average 1 to 3 cm wide. They have been filled, but they keep opening again in the same places.

Outside and inside, the cracks follow different lines. It looks as though the outer decorative brick facing has partly come away from the wall.

In summer 2026 the church was measured with a laser scanner. The measurements show the top of the west wall leaning outwards: by 2 cm on the left and by 1 cm on the right.

One of the specialists' hypotheses is vibration from traffic on the neighbouring streets, to which the heavy tower responds with stress in the adjacent walls. The study has to test this.

A diagonal crack in the yellow brickwork above a pointed window
A crack above a window, outside
A crack running through the brick courses, half the wall in shadow
A crack in the brickwork, outside
A crack in the nave plaster from the ceiling arch down to a stained-glass window
A crack inside, left of the tower
A wide crack in the nave plaster above a stained-glass window
A crack inside, right of the tower
A colour map of the inside of the west wall: yellow and orange areas show deviation
The west wall from inside. Colour shows how far the surface deviates from a flat plane

What still needs to be found out

The cracks cannot simply be patched: first the cause has to be understood. The study will establish the state of the foundations and the ground beneath them, analyse how the walls are deforming, and end with the specialists' report on which works are needed and in what order.

Cost of the study
Management and coordination, report and recommendations€1,557
3D laser-scan survey€725
Sections and deformation analysis€425
Ground investigation: two boreholes, a trial pit at the foundations, groundwater level€2,900
Technical inspection report€1,735
VAT 21%€1,542
Total€8,884

Amounts are rounded to whole euros.

Goal No. 1

First stage of reconstruction: an architectural study of the causes of the cracks

€1,058of €8,884

11%

Raised 11%

We started the programme in August 2026.

Support

The study's findings will decide how the walls are strengthened.

Laser-scan and survey images: Arhitektoniskās izpētes grupa, 2026.